
Upstream Accordion Format
Upstream
Since the times of its Inception, Kavin started providing expert Engineering Solutons for FPSO Top side modules. We have delivered XX complete FPSO topsides among YY completed FPSO projects.
Crude Separation and Stabilization Capacity : 120000 BOPD
API gravity : 13~22; 23~44 degree
Physical Dimensons of the Module: Full Topside & Interface with marine Systems
Tonnange: 26000 Ton
Water Depths: between 300 meter and 3,200 meter
Max Gas Processing Capacity: 720 MMSCFD
- Gas Dehydration
- TEG reclamation and regeneration
- MEG reclamation and regeneration
- Main Gas Compression
- Vapour Recovery Compression
- Gas Lift Compression
- HP Seperation and LP Seperation
- HC Dewpoint package
- Gas sweetening
- Chemical Injection
- Freshwater Reverse Osmosis(RO)
- Heating / Cooling Solution
- Fuel Gas unit
- Power Generation
- Fire water system
- Sulphur Recovery Unit
- Open and Closed drain system
Kavin has succesfully delivered Expert Engineering Solutions for Offshore Platforms across the globe. We adhere promptly to the Local and Global Regulations of the geography where the asset is located. We have completed XX onshore platform projects.
- Gas Dehydration
- TEG reclamation and regeneration
- MEG reclamation and regeneration
- Main Gas Compression
- Vapour Recovery Compression
- Gas Lift Compression
- HP Seperation and LP Seperation
- HC Dewpoint package
- Gas sweetening
- Chemical Injection
- Freshwater Reverse Osmosis(RO)
- Heating / Cooling Solution
- Fuel Gas unit
- Power Generation
- Fire water system
- Sulphur Recovery Unit
- Open and Closed drain system