NORTH PIPELINE REPLACEMENT PROJECT – YIBAL

Process Design Verification, Existing Pipeline Demolition, New Pipelines Installation, Tie-in Details.


Client Galfar Engineering & Contracting SAOG is one of the largest, multi-disciplined engineering, contracting and construction company in the Sultanate of Oman. Established in the year 1972, Galfar Engineering & Contracting SAOG, has today grown into one of the largest construction companies in the Middle East with a turnover of over US$1 billion. Galfar, has the experience and expertise in project management, engineering, procurement and construction in areas like Oil & Gas, Civil, Electro-Mechanical, Roads & Bridges and Environmental projects. The range of projects executed includes oil and gas pipelines, oil and gas production, collection and processing facilities, service contracts in petroleum industry.
Customer Petroleum Development Oman is the foremost exploration and production company in the Sultanate. It accounts for more than 70% of the country’s crude-oil production and nearly all of its natural-gas supply. PDO finds oil fields and develops them into productive assets by drilling wells and constructing and operating various hydrocarbon treatment and transport facilities. The crude oil that is produced from the fields is not sold by the Company but rather delivered to a storage facility at Mina al Fahal, where it is loaded onto sea-going tankers at the discretion of the Company’s shareholders. PDO also finds, develops and operates natural-gas fields and their associated production systems-all on behalf of the Government of Oman.
Location Yibal area, Oman
Duration 8 Weeks
Deliverables
  • Process Engineering Flow Schemes
  • Process Design Basis
  • Site Visit Report
  • Process Datasheets for ESDVs
  • Tie-in philosophy
 
Design Data / Specifications
Destination: Yibal – B to Yibal – A
Fluid Type: Gross Liquid (Oil & Water)
Pipeline Length: 3.8 km
Pipeline Life: 20 years
Maximum Liquid flow: 30500 m3/day

Destination: Yibal – RMS BC-1 Yibal – C
Fluid type: Gross Fluid (Oil, Water & Gas)
Pipeline Length: 1.75 km
Pipeline Life: 20 years
Maximum Liquid flow: 8000 m3/day

Destination: RMS DD-1 Yibal – D
Fluid type: Gross Fluid (Oil, Water & Gas)
Pipeline Length: 0.75 km
Pipeline Life: 20 years
Maximum Liquid flow: 9500 m3/day