|
Front end Engineering Design Services For Halewah Gas Plant |
|
 |
Front end Engineering Design Services For Halewah Gas Plant |
|
PROCESSING FACILITY FOR BAK BLOCK 51 |
|
 |
Process Design Verification, Pipe Rack Design, Interface Piping, Pipe Stress Analysis and Structural Design of Block 51 BAK Processing Facilty. |
|
GAS DEHYDRATION AND TEG REGENERATION PACKAGES FOR UJUNG PANGKAH |
|
 |
Design and Engineering Gas Dehydration and TEG Regeneration Package for UJUNG PANGKAH Development Project. |
|
SURFACE FACILITY EXPANSION – FAHUD |
|
 |
Process Design Verification, Existing Pipeline Demolition, New Pipelines Installation, Tie-in Details, and Safety Zone Classification. |
|
PIPELINE REPLACEMENT – LEKHWAIR |
|
 |
Process Design Verification, Existing Pipeline Demolition, New Pipelines installation, Tie-in Details. |
|
PIPELINE REPLACEMENT PROJECT – YIBAL |
|
 |
Process Design Verification, Existing Pipeline Demolition, New Pipelines Installation, Tie-in Details. |
|
GAS COMPRESSOR PACKAGE FOR SAFAH & WADI LATHAM FIELD BK9 |
|
 |
Detailed Engineering of Gas Compressor Package |
|