TSB FPSO

Complete Process Topside Design Engineering For TSB FPSO

Client VME Process, a leading supplier of Process Systems for the Oil and Gas Industry, with reputable turnkey capabilities in Design, Engineering, Manufacturing and Construction.
Customer BW Offshore is a leading global provider of floating production services to the oil and gas industry. The company is the world’s second largest contractor with a fleet of 14 FPSOs and two FSOs.

Kangean Energy, Indonesia is one of the leading Hydro-Carbon producer operating
over blocks in East Java.

Location Terang Sirasun Batur (TSB), Offshore Indonesia
Duration 8 months
Deliverables
  • Process Simulation
  • PFD/HMBT
  • P&IDS
  • Process Calculation
  • Process Description
  • Data Sheet – Equipments & Instruments
  • Equipment Layout
  • Piping GA/Isometrics/Supports
  • Piping Stress Analysis
  • Structural Analysis & Design
  • Structural Fabrication Drawings
  • Electrical Design/Drawings/Datasheets
  • Instrument Design
  • Instrumentation Drawings/Datasheets
  • Commissioning Procedures
  • Operation & Maintenance Manual
Design Data / Specifications
Total Fluid Capacity –  340 MMSCFD
Condensate Processing Capacity – 2,000 BCPD
Facilities / Modules Designed

Inlet Manifold Module
Gas Separation Module
LP Gas Compressor Module
HP  Gas Compressor Module
Gas Dehydration and Fuel Gas Module
Utility Module
Chemical Injection Module
Flare & Drain Module
Project Management

Comments are closed.