DE-BOTTLENECKING STUDY OF BPA & BPB OFFSHORE PLATFORMS, SBHT LINES AND PROCESS FACILITIES

Project Debottlenecking Study for Process Facilities of Platforms BPA & BPB (Offshore), SBHT Lines and Hazira Plant (Onshore)
Description Debottlenecking Study of Process Facilities of Platforms BPA & BPB, SBHT Pipelines and Hazira Plant
Client Oil and Natural Gas Corporation Limited (ONGC) is an Indian multinational oil and gas company headquartered in Dehradun, India. It is one of the largest Asia-based oil and gas exploration and production companies.
Location Hazira Plant & BPA BPB Complex
Duration 6 months
KAVIN’S SCOPE OF WORK
Debottlenecking Study of the following platforms , plants and pipelines to provide comprehensive solutions to improve production:
BPA & BPB COMPLEX

  • Gas Cooling and Separation, Gas Compression, Gas Dehydration, Condensate Stabilization, Glycol Regeneration using Waste Heat, Water Injection facilities at BPA Produced Water Conditioning, Fuel Gas System, Flare System, Open / Closed Drain System, Hot Oil System, Seawater / Cooling Water System, Well Testing, Instrument and Utility Air System, Inert Gas Generation System, Material Handling System, HVAC System, Fire Fighting System, Automatic Fire and Gas Detection System, Automatic Fire Suppression System, Un-interrupted Power Supply for Control Systems, ATF Re-fuelling System, Quality Control and Analysis Laboratory, Sewage Treatment, Communication System (SCADA), Hypochlorite Generation System, Pot Water Production System & Service Water System Export of Gas and Condensate after metering through 36”, 42” trunk lines to Hazira.

HAZIRA Plant

  • LPG Plant, Kerosene Recovery Unit, Gas Sweetening Unit, Gas Dehydration Unit, Dew Point Depression Unit

South Bassein Hazira trunk lines:

  • 36” Trunk line with 231 km Length
  • 42” Trunk line with 244 km Length

Comments are closed.