BROTOJOYO FPSO

Design and Engineering of Complete Process Topside Facilities for Brotojoyo FPSO

Client VME Process, a leading supplier of Process Systems for the Oil and Gas Industry, with reputable turnkey capabilities in Design, Engineering, Manufacturing and Construction
Customer PetroChina Company Limited (“PetroChina”) is the largest oil and gas producer and distributor, playing a dominant role in the oil and gas industry in China. It is not only one of the companies with the biggest sales revenue in China, but also one of the largest oil companies in the world. It engages in wide range of activities related to oil and natural gas, including: exploration, development, production and marketing of crude oil and natural gas; refining, transportation, storage and marketing of crude oil and oil products; the production and marketing of primary petrochemical products, derivative chemicals and other chemicals; transportation of natural gas, crude oil and refined oil, and marketing of natural gas.
Location SALAWATI Field, Offshore, Indonesia
Duration 6 months
Deliverables
  • Process Simulation
  • PFD/HMBT
  • P&IDS
  • Process Calculation
  • Process Description
  • Data Sheet – Equipments & Instruments
  • Equipment Layout
  • Piping GA/Isometrics/Supports
  • Piping Stress Analysis
  • Structural Analysis & Design
  • Structural Fabrication Drawings
  • Electrical Design/Drawings/Datasheets
  • Instrument Design
  • Instrumentation Drawings/Datasheets
  • Commissioning Procedures
  • Operation & Maintenance Manual
Design Data / Specifications
Total Fluid Capacity –  33,000 BFPD
Oil Processing Capacity – 15,000 BOPD
Produced Water Capacity – 18,000 BWPD
Storage Capacity – 400,000 BOPD
Facilities / Modules Designed
Complete Topside comprising of the following process facilities;
Separation (3 Stage)
Produced Water Treatment
Condensate Stabilization System
HP / LP Flare System
Chemical Injection System

Comments are closed.