Front end Engineering Design Services For Halewah Gas Plant  
 
Front end Engineering Design Services For Halewah Gas Plant
PROCESSING FACILITY FOR BAK BLOCK 51  
 
Process Design Verification, Pipe Rack Design, Interface Piping, Pipe Stress Analysis and Structural Design of Block 51 BAK Processing Facilty.
GAS DEHYDRATION AND TEG REGENERATION PACKAGES FOR UJUNG PANGKAH  
 
Design and Engineering Gas Dehydration and TEG Regeneration Package for UJUNG PANGKAH Development Project.
SURFACE FACILITY EXPANSION – FAHUD  
 
Process Design Verification, Existing Pipeline Demolition, New Pipelines Installation, Tie-in Details, and Safety Zone Classification.
PIPELINE REPLACEMENT – LEKHWAIR  
 
Process Design Verification, Existing Pipeline Demolition, New Pipelines installation, Tie-in Details.
PIPELINE REPLACEMENT PROJECT – YIBAL  
 
Process Design Verification, Existing Pipeline Demolition, New Pipelines Installation, Tie-in Details.
GAS COMPRESSOR PACKAGE FOR SAFAH & WADI LATHAM FIELD BK9  
 
Detailed Engineering of Gas Compressor Package