ENGINEERING & PROJECT MANAGEMENT CONSULTANCY SERVICES FOR CONSTRUCTION OF BAREKURI OCS


Project Construction of Oil Collection Station at Barekuri
Description Engineering & Project Management Consultancy services for Construction of Oil Collecting Station at Barekuri
Client Oil India Limited (OIL) is an Indian public sector oil and gas company based in Assam, India under the administrative control of the Ministry of Petroleum and Natural Gas of the Government of India. OIL is engaged in the business of exploration, development and production of crude oil and natural gas, transportation of crude oil and production of liquid petroleum gas.
Location Barekuri, Assam (India)
Duration 40 months
 

PROJECT DETAILS

Envisaged Minimum facilities

  • Capacity to process 3600 KLPD of fluid for separation.
  • Formation water separation, treatment, storage & safe disposal facility via Water Injection station.
  • Crude Oil dehydration facility to bring down BS&W < 0.2 % (w/w).
  • Storage capacity of minimum 6000 KLs for Crude Oil.
  • Effluent treatment Plant of minimum 1600 KLPD capacity.
  • Crude Oil pumping facility for transportation.
  • LACT (Lease Automated Custody Transfer) facility.
KAVIN’s Scope of Work

Phase 1 – EPC Tender release

  • Basic Engineering & Front End Engineering Design (FEED)
  • Preparation of EPC Tender document and internal estimate for EPC tender and arrangements for holding the pre-bid conference and clarifying to bidders.
  • Evaluation of bids for technical and commercial compliance and submission of the scrutinized bids for OIL’s comments/approval.
  • Selection of EPC contractor jointly with OIL and awarding of contract to EPC contractor.

Phase II – PMC

  • Review and approval of Detailed Engineering.
  • Inspection and Expediting services
  • QHSE Monitoring, Supervision and Certification of Construction work
  • Getting statutory approval through EPC Contractor
  • Settlement of post contractual issues including finalization of ‘Change Orders’.
  • Conducting training for OIL personnel
  • Pre-commissioning and Commissioning supervision
  • Final Certification of the OCS after Trouble free Trial run of the whole plant for 3 months.

Phase-III : Trail run

  • Trail run of the OCS along with OIL’s engineers and EPC contractor etc.