PUO FPSO

Complete Process Topside Re-Modification For PUO FPSO

Client PT Berlian Laju Tanker Tbk, Indonesia is one of the leading fleet owners in South East
Asia owning over 90 vessels and having their fleet presence across the globe – America,
Europe, Asia & Australia. Their fleet strength includes Gas Carriers, Oil Tankers,
Chemical Tankers and FPSO/FSOs.
Customer Kangean Energy, Indonesia is one of the leading Hydro-Carbon producer operating
over 5 blocks in East Java.
Location PUO Field, Offshore Indonesia
Duration 6 months
Deliverables
  • Process Simulation
  • PFD/HMBT
  • P&IDS
  • Process Calculation
  • Process Description
  • Data Sheet – Equipments & Instruments
  • Equipment Layout
  • Piping GA/Isometrics/Supports
  • Piping Stress Analysis
  • Structural Analysis & Design
  • Structural Fabrication Drawings
  • Electrical Design/Drawings/Datasheets
  • Instrument Design
  • Instrumentation Drawings/Datasheets
  • Commissioning Procedures
  • Operation & Maintenance Manual
Design Data / Specifications
Total Fluid Capacity – 20,000 BFPD
Oil Processing Capacity – 7,000 BOPD
Produced Water Capacity – 13,000 BWPD
Gas Capacity – 2.8 MMSCFD
Hot Water Injection Capacity – 6000 BWPD
Storage Capacity – 400,000 BOPD
Facilities / Modules Designed
Project Management Consultancy
Design & engineering of Topsides:

Separation (3 stages)
Produced Water Treatment
HP/LP Flare Gas System
Chemical Injection System
Hot Water Injection System
E House
Fabrication & Erection Assistance at Site
Commissioning
Operation Support

Comments are closed.