BLOCK 51 BAK PROCESSING FACILITY PROJECT

Process Design Verification, Pipe Rack Design, Interface Piping, Pipe Stress Analysis and Structural Design of Block 51 BAK Processing Facilty.

  

Client Global Processing System GPS has an established reputation as a reliable supplier of oil & gas equipment and has a complete turnkey capability in all areas of process equipment and plant supply from integrated design (FEED) through to engineering, fabrication and testing. Through networked offices in strategic locations in South East Asia and the Middle East GPS offers a unique blend of in-house design and fabrication skills. This is supplemented by support and facilities access through its major shareholder Al Jaber Energy Services.
Customer Nexen is a Canadian-based energy company with operations in strategic locations around the world including the North Sea, the Gulf of Mexico, offshore West Africa, Canada, Yemen and Colombia. With more than 4,000 employees worldwide, its primary offices are located in Calgary, Dallas, Uxbridge and Aberdeen. Nexen’s portfolio of assets provides investors with unique exposure to some of the best oil and gas basins in the world: the Athabasca oil sands, North Sea, Gulf of Mexico, Yemen, and offshore West Africa. Nexen pursues three growth strategies: oil sands, conventional exploration and development, and unconventional gas.
Location Al Hajt Field Block 51, Republic of Yemen
Duration 3 months
Deliverables
  • PSV Sizing Calculation
  • Piping GA
  • Piping Isometrics
  • Pipe Stress Analysis
  • Structural Analysis
Design Data / Specifications

Production Capacity – 180,000 BFPD

Crude Capacity – 35000 BOPD
Water Capacity – 145,000 BWPD
Piperack Length – 2 Kms
No of Piperacks – 23 Module Piperack
                           4 Piperack
                           12 Sleeper Racks

Facilities / Modules Designed
Pipie Racks

Comments are closed.